top of page
RIBA Stage 4 Tender submission and returns

This is a bolt on package if you need to gain initial costs before proceeding with a project.  Included in this package is the following :

  • Package contents sent between 3-5 tenderers

  • schedule of Works including any special requirements that need costing before work commences

  • Meeting tendering contractors on site to talk through the design

  • Holding interviews with you and contractors to determine best fit

  • Analysing tender returns and awarding tenders.

bottom of page